Vestas has received a 29 MW order for the Mazara Messer Andrea onshore wind farm in Italy. The project, which is being developed by E2i Energie Speciali is scheduled for commissioning in Q1 2022. Modular electrolyzer manufacturer Enapter has selected Goldbeck to develop its “Enapter Campus” in Saerbeck, Germany. Construction of the 76,000 square meter campus will start in September 2021, with production starting from the end of 2022. Annual production capacity should ramp to more than 100,000 modular electrolyzer systems in 2023. Iberdrola has acquired a majority stake in a 3 GW offshore wind venture created by DP Energy in Ireland. The project pipeline includes the fixed base Shelmalere project as well as the Inis Ealga and Clarus projects,…