Many regulators are hoping to speed the progress of LTE services by supporting a single build-out, which can then power services for several operators. But this approach can also be highly complex and controversial, as seen in the US, Russia and now in Kenya.
Here, the government announced a plan last year to roll out a national, open access LTE network, to be jointly used and funded by the main cellcos. However, the largest cellcos, Safaricom and Orange, have been wary of the idea all along, and now the scheme is in disarray, according to Business Daily Africa, with Safaricom threatening to pull out altogether.
Nzioka Waita, Safaricom’s corporate affairs director, warned that the operator will not take part if the government insists on rolling out the initial network in the 2.6GHz band. The carrier wants to start with 700MHz, because it supports far larger cells, and therefore lower cost first-stage build-out because fewer base stations are needed. It is also more cost effective for rural coverage, while the high capacity and short range of 2.6GHz bands will be more suited to boosting the network once there is a high level of usage, argued Safaricom in a filing. Waita told reporters: ‘We would want to know the frequency band that will be used; if it is not the 700MHz then the government may consider us out of it.’
Many operators are taking a similar view, either relying on sub-1GHz bands for their first wave of roll-out, as at Verizon, or using a mixture of low and high frequency spectrum to balance capacity and coverage, as in much of Europe. One of the major problems of the wholesale approach is that it tends to involve just one initial band, and that has to be suitable to all participants, even if they have different business models and regional focus. But the sub-1GHz spectrum has limitations for a shared network because of its relatively low capacity.
But the regulator, the CCK, dismissed these calls as premature and impracticable until digital switchover is achieved. The CCK’s director general, Francis Wangusi, said immediate surrender of broadcasting frequencies in the 700MHz band would result in disconnection of many Kenyans since digital TV signals are only currently available in capital Nairobi. The deadline for the switch-off of analog TV broadcasting in Africa, parts of Europe, Russia and the Middle East is June 17 2015 in line with an agreement signed at the ITU in 2006. Kenya has set its own date of 2012 but has stressed this is not ‘cast in stone’.
Without Safaricom, the whole project will be in jeopardy since the firm is one of the few local companies which has the capital to roll out LTE. If it leaves, it will have the capability to go it alone, reducing the viability of the wholesale venture, and the open access plan will also lose a major investor, putting more pressure on public money. Other confirmed participants are the other main cellcos – Airtel Kenya, Yu (owned by Essar), and Telkom Kenya (Orange); as well as local broadband providers Kenya Data Networks and MTN Business Kenya. Three vendors are involved in the project, as equipment and services suppliers as well as investors ‘ these are Alcatel-Lucent, Nokia Siemens and Epesi Technologies.