Your browser is not supported. Please update it.

6 July 2021

Orange sets out a vision of its open, cloud-based “network of the future”

By Wireless Watch Staff

Orange has unveiled its vision of “the network of the future”, applying to the French regulator, ARCEP, for permission to trial an experimental cloud-based network that would provide “ambient connectivity”.

The operator wants to run the two-year trial, which it calls Project Pikeo, initially in Lannion, Brittany, where it has a major R&D center. It needs ARCEP approval because it will sign up real business and consumer customers to use the network.

It says the system will be “Europe’s first 5G standalone (SA) end-to-end network operating in a cloud-native mode,” according to group CTIO Michaël Trabbia. “This is an experimental network, but it is a network with real users. The technology is maturing fast but it is still not carrier-grade.”

The network would implement the RAN – based on Open RAN – the core, IT systems and OSS in the cloud. Elisabeth Py, Orange’s 5G next generation operator project director, will head up the trial and has already led the deployment of a fully automated core. Now she wants to use such experiences to create “a blueprint for the next generation of agile networks”.

Some of the proposed vendors have already been named, including Mavenir for 5G Open RAN software, Casa Systems in the core, HPE for subscriber data management and Amdocs for BSS. All this will run on Dell infrastructure and servers including for RAN centralized units and distributed units, and will be tested with Xiaomi devices.

The trial will use the Open Network Automation Platform (ONAP) specifications for managing and orchestrating all the elements, while some other components, such as those for AI and security, have been added or enhanced by Orange.

If successful in Lannion, the system would be extended to further locations in France in 2022, and possibly to other countries. However, Trabbia was keen to stress that this was an experimental network on which Orange would test future use cases as well as network slicing, but it would not slow down deployment of the 5G core. A first generation cloud-native core will be built over the next 2-3 years and “Pikeo will come later”.

2025 is always a popular deadline for operators as they move to open and cloud-native networks. This is the year when Orange believes it will be able to support Open RAN in all new equipment, and when it would be likely to start implementing something like Pikeo across all domains.

“We don’t believe we are ready today — that’s why we are building this experimental network,” Trabbia said. “We don’t necessarily have all the answers today. That’s why we are doing Pikeo. We will refine our plans.”

He summarized: “Our ambition is to prepare Orange for the operator of the future by building more resilient and auto-adaptive networks that offer best in class quality of service in each situation. This experimental network represents an important milestone on our way to implement and deploy Open RAN and AI technologies to prepare on-demand connectivity and zero-touch operator capabilities.”