Although broadband wireless is often presented as the enemy of the 3G cellular operators, some carriers are taking a keen interest in the technology as a way to enhance their core offerings and reduce their own operating costs. There are three main approaches, which may overlap ‘ using WiMAX or an alternative to extend coverage to areas where it is not cost effective to build out 3G (where regulators will allow); deploying WiMAX as a parallel network to offload data intensive applications and increase overall spectrum capacity to support high bandwidth services such as video; and as an alternative to leased lines for backhaul.

The last of these has the most immediate and obvious benefits and is likely to become a major trend, although the impact is purely on costs and the opex/capex balance, reducing costs or at least keeping them under control as more and more services are rolled out. The other two involve a more delicate balance for the carrier ‘ offsetting the costs and complexity of running two different infrastructures against the increase in total capacity and services, and therefore ARPU, in crowded or competitive markets; or against the savings to be made by not running networks in rural areas that have little hope of reaching capacity or ROI.

Sprint, Nextel, SKT, 02 and other majors are trialling various broadband wireless options as a high bandwidth overlay, while others such as T-Mobile in the Czech Republic and Vodafone Sweden aim to use it to extend coverage into sparsely populated areas where the dense layout of base stations typical of 3G will not be justified.

Alan Varghese, author of a new report from ABI Research, predicts that the Sprint and O2 trials will not be just one-off events but reflect the start of a trend. ‘It may be true that the first step was easier for Sprint because they have plentiful 2.5GHz spectrum, and for O2, WiMAX was a natural extension of the WLan hotspots they have deployed across Ireland. But every cellular operator is going to have to consider WiMAX in their strategic planning,’ he said. 02 is also trialling WiMAX in Germany as a potential way to add fixed wireless residential services to its cellular-only portfolio and so compete with the converged wireline/wireless operators ‘ also a trend that we may see taking hold in other cellular-only companies as they seek to fend off the rejuvenated challenge from the wireline incumbents and VoIP.

The advantages of WiMAX as a parallel network for cellcos lie mainly in its spectral efficiency. This is a question not of raw capex and opex but of how much can be delivered for that investment.

Equipment costs will be lower for WiMAX, but the main contrast will be seen in rural areas. Currently, costs for 3G and pre-certified WiMAX are similar to cover a comparable urban territory, and may even favour the cellular technology. In a traditional cellular network, the cost differences would have been dramatic. These were centered around Class 4 and 5 physical switches, which would typically cost $10m each with several per territory; high cost base stations at $100,000 each and more; and expensive leased lines for backhaul.

To some extent, the first two categories have already been addressed in capex terms. 3G networks are typically 30% less capex hungry than 2G ones despite the larger number of base stations required. There is increasing use of softswitches, which are the primary technology for WiMAX, in 3G networks. These not only provide greater flexibility of network configuration and upgrade to IP, but cost only about $500,000.

Base station costs have plummeted in the past three years, because of the impact of the telecoms slump around 2001 and the shift towards cost saving technologies such as field programmable gate arrays (FPGAs) and standardized interfaces. GSM base stations are now around $10,000 per unit, and 3G units are about $13,000, though more are required to cover the same area.

The great variable, of course, is spectrum cost. This is mainly an issue in Europe, where cellular operators paid a total of $70bn to buy 3G licenses in the primary markets such as the UK, France and Germany (other countries, it must be remembered, allocated 3G spectrum at very low cost in order to stimulate roll-out, Finland being a good example). Although some are predicting a goldrush for 3.5GHz WiMAX-suitable spectrum in Europe as interest in broadband wireless intensifies, it will certainly come nowhere close to those bubble costs. Austria, for instance, raised less than €500,000 for its licenses, while Norway charged a total of €6.35m for seven regional 3.5GHz licenses.

However, the most realistic comparison will be with upcoming 3G extension auctions rather than with the 2000 allocations, since most of the large purchasers of licenses ‘ the most notable exception being Vodafone ‘ have written down their 3G auction costs. If the regulators take a flexible approach to the extension bands ‘ as they almost certainly will in non-European regions such as the US ‘ there will be the chance for WiMAX to be run in cellular spectrum, meaning that broadband wireless operators will be competing for the same licenses as the cellcos themselves, and incurring the same costs.

Going forward, then, the gulf between 3G and WiMAX equipment and spectrum costs should close as the two technologies overlap in the mobile arena, and as the major vendors lower 3G equipment costs and start to combine multiple wireless platforms into a single all-IP infrastructure.

In this context, costs of both networks will fall rapidly, WiMAX probably at a greater rate because of unlicensed options and massive competition. However, this will mainly be seen with the development of options that are not available in the first generation, such as the opportunity to use micro and pico base stations in appropriate terrains ‘ much of the total cost of a build-out relies on being able to match the capacity most accurately to the needs of the user base, and future WiMAX base station variations will support this flexibility of configuration, along with easy scalability, very well. But in the first generation, these options are limited, and it is also spurious to compare what a cellco spent creating a national 3G network in 2004 with what an operator might spend in 2007 to cover the same territory with mobile broadband, since the 3G system will already be generating revenue and be on its writedown curve.

What is far more pertinent is to compare the cost per bit of transmission that the two networks can deliver in various scenarios and therefore the profitability that they can deliver to the operator, plus the potential for extra ARPU that a dual network may provide by supporting additional services. This is especially true in markets where the cellco has limited 3G bandwidth, or conversely, where there are too few subscribers to justify exploiting that bandwidth. While 3G base stations may be coming down in price, large numbers are required for coverage, and total cell site costs are high. That means that it is not highly cost effective in areas of dispersed population. WiMAX is far more flexible and scalable as are other broadband wireless options such as Flash-OFDM. The ratio in a rural area is about nine 3G base stations to one for WiMAX in 3.5GHz, and 15 to one for technologies working in sub-1GHz spectrum, such as Flarion Flash-OFDM or CDMA450 in 450MHz (spectrum for which WiMAX could gain a future profile too).

In Sweden and Finland, for instance, the regulators are set to allow operators to deploy 3G-class services in the 450MHz spectrum, rather than being required to use W-CDMA gear. In Sweden, it is estimated that two of the three 3G license holders, Vodafone and Hutchison, could save about $400m between them by using the 3G version of CDMA450, or Flarion Flash-OFDM, instead of W-CDMA for rural areas.

Vodafone and Hutchison are cooperating on building a 3G network in areas outside major cities in Sweden. It is estimated that to complete their coverage obligations they will need a further 2,000 rural base stations, but using 450MHz, this number could be reduced to about 140.

Where cost comparisons are also highly valid are in opex, and in areas where the cellco has not yet invested in 3G and so will be meeting any challengers from a more level start. These areas may be untouched geographic territory that lacks any mobile services beyond 2G, or application areas that will require additional bandwidth capacity to support effectively, such as mobile television, where Qualcomm’s MediaFlo is an example of an OFDM-based technology designed to work alongside 3G.

Finally, there is the consideration of the benefit that a cellular operator may gain by taking an early move with WiMAX itself and potentially keeping new competitors sidelined.

The greatest area of cellco opex lies in backhauling its base stations, a burden that is increasing exponentially. Here, WiMAX and other, higher frequency wireless technologies offer the third great benefit to the mobile carrier, by providing an alternative to leased lines or the purchase of fiber. Many early WiMAX deployments rely on self-backhaul, where there is a short distance to the point of presence, or on longer distance point-to-point wireless links in higher spectrum such as LMDS, and this pattern is increasingly being copied in 3G networks. Although investing in wireless backhaul requires higher capex than leasing telco lines, it involves no ongoing lease costs and, with increasingly efficient and reliable microwave equipment emerging, is largely eliminating old disadvantages in terms of high maintenance costs.

About 18% of cellco’s opex goes on backhaul leasing and maintenance, and the figure increases threefold once the network is all-3G, according to Nortel. The situation is improved by moving to packet-based backhaul, notably IP, which can aggregate more traffic per leased line, but the combination of owned wireless lines and IP switching can have a dramatic effect on opex, bringing backhaul down to under 10% of the total if spectrum is owned (operators that are not using all their spectrum can even lease capacity to enterprises or other players to add a new revenue stream.)

Vodafone – in one of the most dramatic moves in this direction so far, and one that is likely to be a blueprint for other cellcos and other units of the mobile giant ‘ is to build its own broadband wireless backhaul network to replace leased lines at most of its 8,000 base station sites in the UK. Like all 3G operators, Vodafone is facing mushrooming backhaul requirements because of the higher density of UMTS networks and the rising usage of high bandwidth data services ‘ half of the world’s 3G base stations now need two or more backhaul links to cope with capacity requirements, even now, when the networks are not delivering their full potential in terms of data applications. Also like all 3G carriers, Vodafone is under increasing pressure, as it sees its more optimistic hopes of 3G return on investment dissolving, to cut operating costs in order to preserve margins.

Vodafone currently leases backhaul lines from BT and some smaller fixed line providers such as Kingston Communications. The operator’s original 1985 license terms barred it from building its own fixed infrastructure links, whether wired or wireless, but this ban was lifted in 2002. The UK cellcos have been moving rapidly towards wireless backhaul, partly because BT’s leasing charges remain high by European standards. T-Mobile (then One-2-One) and Orange were encouraged by Ofcom to build their own microwave backhaul networks when they entered the UK market in the mid-1990s, and were given some spectrum to support this, as a way to stimulate competition to BT. Orange relies on wireless for 90% of its backhaul capacity. The holding of spectrum is a significant advantage, which Vodafone will not have ‘ Alcatel, which claims 35% market share of cellular wireless backhaul equipment, estimates that microwave options are 40% cheaper than leased lines if the carrier rents its spectrum, but 80% if the frequencies are owned, on average.

In the UK, backhaul leasing costs are based on distance, and range from typically range from £2,000 for less than 10 kilometers, to £6,000 for 30 kilometers. About half the sites will require the longer lines, making a total cost to a company like Vodafone about £32m a year for just one country, a sum that will grow with greater data requirements, multiple backhaul links per base station and the introduction of HSDPA. If a microwave network of the scale and robustness required by a cellco takes five years to break even, and typically has a working life of 10 years, the lure is, of course, five years of ‘free’ backhaul or about £150m in savings.

Vodafone already uses wireless backhaul in Germany, where it acquired Mannesmann Mobilfunk, which had already created its own backhaul network ‘ mainly microwave, with some fiber. A solution of increasing interest to cellcos will be ‘wireless fiber’ approaches, including high spectrum radio solutions like GigaBeam WiFiber, or free space optics technologies like those from Lightpointe.

WiMAX, in time and in its mobile form, will be a bugbear for mobile operators by allowing more competition in mobile broadband, squeezing the rates that can be charged for 3G services and forcing cellcos into early network upgrades. But it can also be their friend, allowing them to extend their networks cost effectively into new territories and applications and even to move into the fixed residential market. In the shorter term, mobile operators are already considering their broadband wireless options, even before mobile WiMAX is a reality, with the possibility of implementing proprietary solutions such as Flarion Flash-OFDM or Navini Ripwave to achieve the same benefits. And they are certainly becoming convinced of the advantages of adopting broadband wireless for their exploding backhaul needs, as Vodafone’s decision shows. If the independent tcellcos use broadband wireless both to enhance their own ability to offer mobile triple play access services and to reduce their dependence on telco leased lines for backhaul, they could find themselves biting back against the new pressure from converged carriers and hitting the incumbent telcos where it hurts.