Last week we looked at the latest activities by US cable industry R&D organization CableLabs, to position a combination of DOCSIS technologies and HFC as ideal for small cell backhaul. To follow on from that, we publish this analysis of DOCSIS’s opportunities in 5G, by our sister analyst service, Faultline, which provides weekly insights into the digital video markets.
All the way back when Vodafone first bought Kabel Deutschland in 2013, it has been blithely stated that cable can provide backhaul for small cells. And it can – but what about small 5G cells?
The advantage that cable has over other candidate technologies, with the exception of fiber, is that it has behind it a technology pathway organization – CableLabs – every bit as single-minded as 3GPP on the radio side, to get such a job done. Last week a paper from CableLabs was issued, designed to bring to light much of the work it has already done in cable backhaul and even small cell fronthaul.
There were many issues to begin with. Capacity is a challenge where the DOCSIS technologies are a positive, but latency is a real issue, and in particular in bidirectional connections – one for data delivery and one for passing control information back the other way, perhaps to support 5G-critical dynamic interference management services such as CoMP (coordinated multipoint).
To do this DOCSIS has to turn itself inside out, drop some of its own scheduling protocols and become aware of system messages from LTE-A and 5G far earlier, so that it can coordinate its own activity. In other words, it has to become something rather different from what it was originally designed to be.
Some cable backhaul is already in play, but not for prime, time-dependent services and only for 4G. But the paper, produced jointly by Belal Hamzeh, the VP for wireless at CableLabs, and Jennifer Andreoli-Fang, distinguished technologist there, puts into context all the work done at CableLabs to create the DOCSIS technologies for 5G mobile backhaul – something which will be just about ready for implementation, with the arrival of DOCSIS 3.1 Full Duplex, for which components are now on trial.
We would judge that 5G-capable backhaul products and services could be created using this specification by around mid-2019.
The paper begins with what 5G needs – 50-100Mbps on the downlink and 10-20Mbps on the uplink, and latency ranging from 5ms to 20ms on the air interface. It makes the point that low control plane latency is critical to ensure the effectiveness of 5G interference mitigation technologies such as CoMP.
It is no coincidence that DOCSIS 3.1 throws away the single signal approach used in all prior versions of the standard in favor of OFDM modulation, advanced forward error correction (FEC) and higher modulation orders up to 4096 QAM across about 1110 MHz (108 MHz to 1218 MHz) of cable frequency and potentially on to 1686 MHz (108 MHz to 1794 MHz).
This would theoretically create a two-way 10Gbps full duplex environment, but CableLabs claims that a single 192 MHz can support over 5Gbps (which probably means 2.5Gbps PHY in each direction, which in real world performance would be closer to 1.85Gbps each way. There may also be perhaps another 5% overhead in processing effort for interference cancellation with full duplex). Only four such channels can be set up in DOCSIS 3.1, leaving a maximum throughput closer to 7.4Gbps, not 10Gbps. Regardless, this is plenty of capacity.
It is one thing to say that DOCSIS 3.1 can be used as backhaul for 5G, and quite another to put consumer broadband and 5G support on the same CMTS (cable modem termination system) or CCAP (converged cable access platform) hardware – except where it is virtualized, a process only being implemented for the first time today.
The paper goes into detail on how the DOCSIS real time polling service and CMTS need to be organized specifically to meet 5G specs. At present the scheduler waits 2ms for a polling opportunity and then plans the next 2ms of traffic, and requests the bandwidth – which almost, but not quite, breaks the latency requirements of 5G.
It instead suggests a pipelining arrangement can be built so it is not waiting for LTE to spend time accessing a channel and then also wait the same amount of time again for DOCSIS to access another channel – this means the DOCSIS request-schedule will start earlier and keep latency under 5ms because the requests are sent in parallel.
Naturally the paper concludes that CableLabs has a real opportunity for working with LTE and 5G networks, but the commercial model will need to be worked out by the stakeholders. This method could encourage MNOs to buy-in backhaul from cable, or make cablecos’ job easier when invading the cellular marketplace. In countries like Germany, where Vodafone holds cable assets, it will obviously be both, but in countries like the US, where cablecos can be the sworn enemy of MNOs, it is more likely they will challenge the supremacy of existing mobile players by using cable to lower the cost of laying cellular to augment their MVNO deals.
But here is something of a conundrum – DOCSIS is notoriously expensive compared to similar technologies like Ethernet over cable (EoC) or multimedia over coax (MoCA) – which has just made a bid for the access marketplace – or G.fast. This last has inherent advantages, in that it supports sub-1ms latency, mostly because it is a star network, which means that there is no requirement for a complex MAC to distribute resources across a multi-drop layout. G.fast can be used on non-DOCSIS coax but cannot coexist with it.
Nevertheless, DOCSIS is a strong candidate, but only if it can be plugged into cellular networks as if it were simply fiber, an area where G.fast and its successors may have more opportunities (next generation G.fast versions will push it to 10Gbps). So this DOCSIS arrangement for backhaul is more interesting for cable companies which want to get into mobile, than for mobile companies who wish to work alongside cable.
Another hurdle for DOCSIS is to reduce the network to a fully fiber service up to the point it turns into coax – so one without amplifiers chained up in a line, which would alter latency. Most existing networks cannot reach this state easily without considerable investment. It has to be said that cable firms everywhere are driving fiber deeper into the network, but we are not sure that MNOs ever really need to take DOCSIS over coax and may instead just harness the fiber that is already extended by cable companies close enough to base stations.